PE-1000 Optical Voltage Gain Adjustments

PE-1000 Optical Voltage Gain Adjustments

The attached PDF will explain how to adjust the gain for the optical cell of the PE-1000.

This procedure should only be carried out after a PM and it is insured that the system is clean.

    • Related Articles

    • RA-3 Optic Adjustment

      This procedure should only be done at the direction of the AGS Technical Support Team, and after all other options have been exhausted. ​It is important that the Voltages are adjusted with a very clean cell and end cap glass pieces in place; ...
    • RA-4300A Optical Auto Adjust

      This procedure should only be done after consultation with AGS Technical Support Care should be taken that this procedure is not done when the flowcell is dirty 1) Occasionally after a hardware change like a lamp replacement, or flowcell adjustment ...
    • Optical Voltage Adjustment

    • PE-1000 Autosampler Turret adjustment

      The attached PDF is a document that can be used to adjust the position of the turret on the autosampler.
    • MA-2000 LAMP REPLACEMENT and/or ADJUSTMENT

      This procedure will walk you through how to replace the lamp on the MA-2000.  It can also be used if the lamp needs to be adjusted for correct voltage readings. 1. Open the front of the system  2. Open the optics box  3. Remove the cell, tubing, etc. ...