HT-300A Borders Markout Procedure
The attached PDFs will explain the boundaries/borders markout procedure for the HT-300A autosampler for the PE-1000. If the instructions for one of the attached files does not allow entry into the Borders Markout, then try the other file, as some autosamplers have different software versions based on manufacturing dates.
Related Articles
HT-3103A Borders Markout Procedure
The attached PDF will help you perform the borders markout procedure for the HT-3103A autosampler, including how to install the syringe after the procedure.
HT-300A Touch and Plunger Zero
The attached PDF will explain how to zero the plunger on the HT-300A autosampler for the PE-1000.
PE-1000 Lamp Replacement
The attached PDF may be used to replace, or exchange, the lamp in the PE-1000 instrument. This procedure was taken directly from the manual. You can find the manual here.
PE-1000 Injection Setup and Alignments
The attached PDF will walk you through the proper setup and settings for the autosampler injection into the PE-1000.
PE-1000 Optical Voltage Gain Adjustments
The attached PDF will explain how to adjust the gain for the optical cell of the PE-1000. This procedure should only be carried out after a PM and it is insured that the system is clean.